Finished kitchens, with the real numbers.
What each one cost, how long it sat on site, and what was actually involved — the same detail we'd give you for yours.
-
Clifton, Bristol 2026
The Island Rebuild
A galley kitchen opened into the dining room, built around a single 3.2m island in riven slate and smoked oak. The original wall was load-bearing, so the design was built around a hidden steel beam disguised as a ceiling detail.
£31,400Investment8 weeksOn siteIsland + 9.2m runCabinetry -
Bath 2026
The Period Refit
A Georgian townhouse kitchen, cabinetry designed to sit honestly alongside the original cornicing rather than fight it. Conservation-area rules meant the external extractor route had to be agreed with the local authority before work started.
£26,800Investment7 weeksOn site7.8m runCabinetry -
Weston-super-Mare 2025
The Full Strip-Out
Complete rewire and replumb behind a full bespoke fit — nothing from the original 1980s kitchen kept except the walls. The consumer unit needed upgrading before any new electrics could go in.
£41,200Investment10 weeksOn siteFull rewireScope